INDUSTRIAL PAINT EPOXY KOVA KL-5 BACKGROUND WALL

Xuất Xứ:

PRODUCT DESCRIPTION

EPOXY KOVA KL-5 industrial wall paint is a 2-component water-based epoxy paint, based on an epoxy film-forming agent used to cover the walls of industrial workshops, basements, water tanks, sewage treatment tanks, parking lots, water park, food factory, pharmacy, hospital, school, etc.

SUPERIOR CHARACTERISTICS

  • Mild chemical resistant, waterproof, resistant to slight back pressure.
  • Wear-resistant, easy to clean.
  • Can integrate outstanding antibacterial and mildew resistance. The gloss of the paint film can be adjusted.
  • Good adhesion on cement mortar, concrete, steel, wood.
  • Non-flammable, non-toxic, free of lead, mercury and other harmful chemicals, safe for construction and use

PRODUCT INFORMATION

Applicable surface

Concrete, cement mortar, metal, wood surfaces

Theoretical norms

4.0 – 5.0m2/kg (for 2 layers), depending on the surface of the material.

CONSTRUCTION INSTRUCTIONS

SURFACE PREPARATION

  • All surfaces must be dry and free of dirt, grease, moss, lime, old paint.
  • For new walls, it takes at least 12 days for the structure to stabilize before painting.
  • It is recommended to use waterproofing agent KOVA CT-11A, mastic KOVA KL-5 on the wall before applying industrial paint EPOXY KOVA KL-5 on the wall.

CONSTRUCTION

  • Step 1: Thoroughly stir the paint composition. Add all the additives to the paint, absolutely do not leave any additives, stir again, can add 5-10% clean water to fit the liquid (The weight of 2 components has been weighed in the barrel according to the prescribed ratio. , the paint film will not dry without enough additives).
  • Step 2: Allow about 3 minutes for the additive to fully react with the paint. Stir once more before painting.
  • Step 3: Apply 2 coats of KL-5, each layer at least 8 hours apart. The paint film reaches the maximum hardness after 7 days (Must use all paint within 30-45 minutes after mixing the 2 components, after that time the paint will harden and the quality will decrease. arrive there).

NOTE

  • Only apply when the weather is dry and the surface temperature does not exceed 400C. Do not apply in high humidity weather.
  • When construction and after construction is completed, ensure ventilation so that the paint film dries quickly and ensures gloss. If the surface is not good, it will make the paint take a long time to dry and the paint will be white and translucent, losing its luster.
  • Do not apply paint on cement paste, ceramic tiles, stone and other very smooth surfaces because the paint is difficult to adhere to.

SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION

The working environment must be well ventilated. Wear gloves, masks and eye protection while working. In case of eye contact, wash with plenty of clean water and consult a doctor immediately. Please refer to the latest technical and safety documentation before use.


Đại lý có tài khoản vui lòng đăng nhập để mua hàng hoặc đăng ký tài khoản (tại đây).

Nếu bạn chưa là đại lý trong hệ thống Cường Lâm vui lòng liên hệ chúng tôi (tại đây).

×

Net Orders Checkout

Item Price Qty Total
Subtotal 0 VND
Shipping
Total

Shipping Address

Shipping Methods