EPOXY KOVA INDUSTRIAL PAINT KL-5 FLOORS S, T, D, A

Xuất Xứ:

PRODUCT DESCRIPTION

Industrial floor paint EPOXY KOVA KL-5 is a 2-component water-based epoxy paint, used to cover the floors of industrial workshops, basements, water tanks, sewage treatment tanks, parking lots, water parks, food factories. products, pharmaceuticals, hospitals, schools. Can be used for platforms S, T, D, A.

SUPERIOR CHARACTERISTICS

  • Mild chemical resistant, waterproof, resistant to slight back pressure.
  • Resistant to light loads, impact, abrasion, easy to clean.
  • It is possible to integrate outstanding antibacterial and mildew resistance and adjust the gloss of the paint film.
  • Good adhesion on cement mortar, concrete, steel, wood.
  • Non-flammable, non-toxic, free of lead, mercury and other harmful chemicals, safe for construction and use

    PRODUCT INFORMATION

    Applicable surfaces: Concrete, cement mortar, metal, wood surfaces
    Theoretical norm: 3.0 - 4.0m2/kg (15 - 20m2/set), for 2 layers depending on the surface of the material.

    Dry thickness: 60 – 80µm (for 1 coat), under normal application conditions.

    CONSTRUCTION INSTRUCTIONS

    SURFACE PREPARATION

    • All surfaces must be dry and free of dirt, grease, moss, lime, old paint.
    • For new floors, it takes at least 21 days for the concrete structure to stabilize before painting
    • It is recommended to use waterproofing agent KOVA CT-11A, mastic KOVA KL-5 floor before applying industrial paint EPOXY KOVA KL-5 floor

    CONSTRUCTION

    • Step 1: Stir the paint ingredients thoroughly. Add all additives to the paint, absolutely do not omit additives, stir again, can add 5-10% clean water to fit the liquid (The weight of 2 components has been weighed in the barrel according to the prescribed ratio. , the paint film will not dry without enough additives).

    • Step 2: Allow about 3 minutes for the additive to react with the paint. Stir once more before painting.

    • Step 3: Apply 2 layers of KL-5, each layer is spaced at least 12-24 hours apart. The paint film reaches its maximum hardness after 7 days (The paint must be used up within 30 minutes after mixing the 2 components, after that time the paint will harden and the quality will decrease. ).

    NOTE

    • Only apply when the weather is dry and the surface temperature does not exceed 400C. Do not apply in high humidity weather.

    • When construction and after construction is completed, ensure ventilation so that the paint film dries quickly and ensures gloss. If the surface is not good, it will make the paint take a long time to dry and the paint will be white and translucent, losing its luster.

    • Do not apply paint on cement paste, ceramic tiles, stone and other very smooth surfaces because the paint is difficult to adhere to

    SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION



    Đại lý có tài khoản vui lòng đăng nhập để mua hàng hoặc đăng ký tài khoản (tại đây).

    Nếu bạn chưa là đại lý trong hệ thống Cường Lâm vui lòng liên hệ chúng tôi (tại đây).

    ×

    Net Orders Checkout

    Item Price Qty Total
    Subtotal 0 VND
    Shipping
    Total

    Shipping Address

    Shipping Methods